The Design-Build multi-phased bridge improvements activities on Interstate 59 included:
- Removal of the existing bridge to accomplish improvements to two (2) bridge sites and bridge widening for six (6) sites
- Repair of cracked/spalled/damaged existing concrete pavement
- Traffic rail replacement
- Replacement of all joints for bridges
- Installation and repair of eroded bridge abutment slopes
- Traffic control