The Design-Build bridge improvements activities for Interstate 55 in Lincoln and Pike counties included:
- Bridge design, construction, widening, reconstruction, and repair for ten (10) bridge sites
- Replacement of existing bearing devices
- Repair and reconstruction of existing bridge joints
- Replacement of cracked concrete slab
- Installation of new guard rail